Program Oversight Through Construction and Commissioning
Phase 3 of the Milestones Approach — construction, commissioning, and first criticality — requires governance discipline that keeps programs on track without substituting for the regulator's authority.
Scope of Oversight Advisory
Programmatic and governance-focused oversight.
Governance Structures
Frameworks for tracking vendor performance against contract milestones, with clear escalation pathways and decision-rights protocols.
Independent Schedule & Cost Audits
Program-level schedule and cost audits that identify slippage early, before it compounds into structural delay.
Multi-Party Coordination
Structured coordination between owner/operator, regulator, and vendor during construction — ensuring information flows and issues are surfaced promptly.
Pre-Operational Inspection Preparation
Support in preparing for pre-operational regulatory inspections, ensuring documentation and organizational readiness are in place.
Important Boundary
Vertex Atomic's construction oversight is programmatic and governance-focused. Reactor-system inspection, engineering QA/QC, and safety-case review are performed by the licensed regulator, vendor, and qualified technical inspection bodies — not by Vertex Atomic. We do not perform on-site construction inspection of nuclear safety systems, and we do not substitute for the regulator's binding technical determinations.
Next Step
Talk to us about construction-phase governance.
Program-level oversight that keeps construction on track without overstepping institutional boundaries.